top of page
Oil wells2.png

Leman EP

Operational

Operator:

Perenco

Country:

UK

Block:

49/27

49/27
Tree5.png
turbine2.png

Type:

Gas

Facility:

Production

Water Depth:

38

Installed:

1968

meters

Block:

49/27

Design:

Fixed steel

Sub Structure:

487

Topsides Wgt:

669

tonnes

tonnes

Intro

Companion to ED in the Perenco 49/27E grouping, handling production tie-ins.

Field

Works within the Rotliegendes reservoir; contributes to export flows.

Facilities

EP conveys fluids to central pipelines and includes minimal utilities aligned with cluster management.

drill2.jpg
Drilltower.jpg
49/27
Heat Exchanger2.png
marineengine.png
valve2.png

SUBMIT YOUR STORIES AND PHOTOS

RigOil is built on the stories of the people who lived and worked offshore. If you have photos or memories from life on a North Sea platform, we’d love to include them in the archive.
 

Upload your photos and help preserve this shared history.*

Image Upload

*By submitting content, you confirm you have the right to share it and grant RigOil a non-exclusive, royalty-free licence to use the material for editorial, promotional, and commercial purposes. Copyright remains with the contributor.

bottom of page