
Type:
Gas
Facility:
Production
Water Depth:
38
Installed:
1968
meters
Block:
49/27
Design:
Fixed steel
Sub Structure:
487
Topsides Wgt:
669
tonnes
tonnes
Intro
Companion to ED in the Perenco 49/27E grouping, handling production tie-ins.
Field
Works within the Rotliegendes reservoir; contributes to export flows.
Facilities
EP conveys fluids to central pipelines and includes minimal utilities aligned with cluster management.






SUBMIT YOUR STORIES AND PHOTOS
RigOil is built on the stories of the people who lived and worked offshore. If you have photos or memories from life on a North Sea platform, we’d love to include them in the archive.
Upload your photos and help preserve this shared history.*
*By submitting content, you confirm you have the right to share it and grant RigOil a non-exclusive, royalty-free licence to use the material for editorial, promotional, and commercial purposes. Copyright remains with the contributor.


