
Type:
Gas
Facility:
Production
Water Depth:
19
Installed:
1968
meters
Block:
53/1a
Design:
Fixed steel
Sub Structure:
680
Topsides Wgt:
2225
tonnes
tonnes
Intro
Perenco installation paired with FD, contributing to cluster production and export pipeline feeds.
Field
Gas from Rotliegendes reservoir in Block 49/27 is transmitted through cluster export lines.
Facilities
FP collects fluids and ties into Perenco export infrastructure; utilities and control systems are networked with adjacent installations.







SUBMIT YOUR STORIES AND PHOTOS
RigOil is built on the stories of the people who lived and worked offshore. If you have photos or memories from life on a North Sea platform, we’d love to include them in the archive.
Upload your photos and help preserve this shared history.*
*By submitting content, you confirm you have the right to share it and grant RigOil a non-exclusive, royalty-free licence to use the material for editorial, promotional, and commercial purposes. Copyright remains with the contributor.


