top of page
Oil wells2.png

Leman FP

Operational

Operator:

Perenco

Country:

UK

Block:

53/1a

53/1a
Tree5.png
turbine2.png

Type:

Gas

Facility:

Production

Water Depth:

19

Installed:

1968

meters

Block:

53/1a

Design:

Fixed steel

Sub Structure:

680

Topsides Wgt:

2225

tonnes

tonnes

Intro

Perenco installation paired with FD, contributing to cluster production and export pipeline feeds.

Field

Gas from Rotliegendes reservoir in Block 49/27 is transmitted through cluster export lines.

Facilities

FP collects fluids and ties into Perenco export infrastructure; utilities and control systems are networked with adjacent installations.

drill2.jpg
Drilltower.jpg
53/1a
Heat Exchanger2.png
marineengine.png
Galley Filler.png
valve2.png

SUBMIT YOUR STORIES AND PHOTOS

RigOil is built on the stories of the people who lived and worked offshore. If you have photos or memories from life on a North Sea platform, we’d love to include them in the archive.
 

Upload your photos and help preserve this shared history.*

Image Upload

*By submitting content, you confirm you have the right to share it and grant RigOil a non-exclusive, royalty-free licence to use the material for editorial, promotional, and commercial purposes. Copyright remains with the contributor.

bottom of page