Type:
Gas
Facility:
Production
Water Depth:
43
Installed:
2012
meters
Block:
47/2a
Design:
Fixed steel
Sub Structure:
1574
Topsides Wgt:
1266
tonnes
tonnes
Intro
The York platform is a fixed steel normally unmanned installation in the York gas field in the UK Southern North Sea. Commissioned in 2013, it produces gas and sends it via a subsea pipeline to the Easington gas terminal for processing. It contains well slots and basic flow control infrastructure without permanent accommodation.
Field
The York gas field lies in Blocks 47/2a, 47/3a, 47/3d and 47/3e, discovered in 1993 and producing since 2013. Reservoirs host modest gas volumes, with development focused on a single platform tied to shore.
Facilities
The York NUI platform sits on a four-leg steel jacket and contains several well slots (initially ~2) with integrated wellheads and Xmas trees. Production fluids are routed through an integrated manifold to a subsea pipeline (~34-km, 16-inch) to the Easington terminal for onshore gas processing and entry to the National Transmission System. The installation includes remote-operated shutdown valves, chemical injection for hydrate control, and instrumentation powered locally for control loops. There is no accommodation; the platform operates unmanned under remote SCADA control. Utility infrastructure is minimal, comprising power for control, fire & gas detection, and well safety systems. Pigging facilities and corrosion control systems support flow assurance over the life of the field.
Similar Platforms







SUBMIT YOUR STORIES AND PHOTOS
RigOil is built on the stories of the people who lived and worked offshore. If you have photos or memories from life on a North Sea platform, we’d love to include them in the archive.
Upload your photos and help preserve this shared history.*
*By submitting content, you confirm you have the right to share it and grant RigOil a non-exclusive, royalty-free licence to use the material for editorial, promotional, and commercial purposes. Copyright remains with the contributor.