Rough AP
A fixed steel-jacket production/processing platform in the Rough Alpha complex (47/8A) of the Southern North Sea Rough field. Installed 1975, it initially exported gas to the Easington Gas Terminal and later formed part of the gas storage conversion infrastructure. (turn0search24)
Operator: Spirit
Status: Operational

Image Source: Spirit. (All rights belong to the original owner.)
Production: Gas
Operations start: 1985
Water depth: 37 m
Country: UK
Block: 47/8b
Type: Fixed steel jacket
Field
The Rough field, discovered in the late 1960s, was developed for gas production starting in 1975 and repurposed as a national gas storage facility in 1985. The Rotliegendes reservoir provides seasonal cyclic storage with exports through onshore processing at Easington. (turn0search24)
Facilities
Rough AP housed central processing facilities including gas conditioning, metering, and rerouting for sulphur and water removal prior to export. Its structural jacket supported topside processing modules, export header connections, and utility systems. During storage operations, AP coordinated injection and withdrawal cycles, linking to Bravo's compressor trains via subsea pipelines and to AD via an 18- interconnecting pipeline. AP's utilities included electrical generation/distribution (fed via subsea cable from Bravo), control systems, firewater, safety shutdown systems, and chemical injection for flow assurance. Processed gas was exported through a 36- pipeline to the Easington onshore terminal. In the early storage era, export of stored gas was coordinated through Bravo facilities equipped with twin Rolls-Royce Avon compression trains. The AP platform's role evolved to focus on interface and processing support rather than direct reservoir pressure maintenance with the Rough field's seasonal storage operation. Facilities have been prepared for decommissioning as part of the Rough Alpha installation removal. (turn1search1)

Similar Assets
News