Leman J

Perenco fixed jacket installation installed 1984-85; wells tie into Perenco export infrastructure and into the 49/27 hub. Decommissioning activity has commenced.

Operator: Perenco

Status: Operational

Leman J platform photo

Image Source: Perenco. (All rights belong to the original owner.)

Production: Gas

Operations start: 1968

Water depth: 42 m

Country: UK

Block: 49/28

Type: Fixed steel jacket

Field

Rotliegendes reservoir gas from Block 49/27 flows through shared export infrastructure after processing hubs.

Facilities

J collects and feeds gas into cluster export pipelines. Utilities include control and monitoring systems integrated within the Perenco Southern Hub network.

Leman J layout
Image Source: Perenco. (All rights belong to the original owner.)