top of page
Leman H
Perenco fixed platform installed 1984-85 with well slots tied to cluster export infrastructure; recent decommissioning paperwork submitted.
Operator: Perenco
Status: Operational

Image Source: Perenco. (All rights belong to the original owner.)
Production: Gas
Operations start: 1968
Water depth: 38 m
Country: UK
Block: 53/2
Type: Fixed steel jacket
Field
Part of the Rotliegendes reservoir cluster in Block 49/27; gas exported via pipelines toward Bacton after cluster consolidation.
Facilities
H gathers well fluids and routes to the 49/27A/BT export headers. Utilities include control integration, safety systems, and export metering ties.

Image Source: Perenco. (All rights belong to the original owner.)
Similar Assets
News
bottom of page