top of page

Leman FP

Perenco installation paired with FD, contributing to cluster production and export pipeline feeds.

Operator: Perenco

Status: Operational

Leman FP platform photo

Image Source: Perenco. (All rights belong to the original owner.)

Production: Gas

Operations start: 1968

Water depth: 19 m

Country: UK

Block: 53/1a

Type: Fixed steel jacket

Field

Gas from Rotliegendes reservoir in Block 49/27 is transmitted through cluster export lines.

Facilities

FP collects fluids and ties into Perenco export infrastructure; utilities and control systems are networked with adjacent installations.