Leman E

Shell fixed platform (Block 49/26E) historically gathering gas for the central export hub.

Operator: Shell

Status: Operational

Leman E platform photo

Image Source: Shell. (All rights belong to the original owner.)

Production: Gas

Operations start: 1968

Water depth: 37 m

Country: UK

Block: 49/26

Type: Fixed steel jacket

Field

Part of Rotliegendes gas field that connects into the main Leman export systems via Leman A.

Facilities

E's wells were routed into shared flowlines which fed capture and processing at the Alpha complex for pipeline export. Facilities included standard utility support for monitoring, control and safety.