top of page

Leman BC and BD

Fixed platforms in the Perenco Leman 49/27B cluster; BD often denotes drilling/wellhead functions and BC (alias BP in sources) denotes production and tie-in duties.

Operator: Perenco

Status: Operational

Leman BC and BD platform photo

Image Source: Perenco. (All rights belong to the original owner.)

Production: Gas

Operations start: 1968

Water depth: 34 m

Country: UK

Block: 49/27

Type: Fixed steel jacket

Field

Part of the Rotliegendes gas producing Block 49/27 network which routes through local compression and pipelines to Bacton Gas Terminal.

Facilities

BC/BD handle well collection and may host pressure control systems before routing gas into the BT export system. Utilities and controls are aligned with the Perenco Leman export network.

Leman BC and BD layout
Image Source: Perenco. (All rights belong to the original owner.)

Similar Assets

News

bottom of page