Leman AX

Another normally unmanned platform in the Perenco Leman 49/27A grouping providing production feed tie-ins to the cluster that routes into export infrastructure to shore.

Operator: Perenco

Status: Operational

Leman AX platform photo

Image Source: Perenco. (All rights belong to the original owner.)

Production: Gas

Operations start: 1968

Water depth: 36 m

Country: UK

Block: 49/27

Type: Fixed steel jacket

Field

Part of the Leman field's Rotliegendes reservoir in Block 49/27; collaborated into the central export hub feeding Bacton.

Facilities

AX collects fluids from field wells and conveys them via subsea/bridge lines to the main 49/27A processing cluster. Gas is then piped to shore through the Perenco pipelines to Bacton. Utility loads are supported by hub infrastructure rather than standalone systems.

Leman AX layout
Image Source: Perenco. (All rights belong to the original owner.)