top of page

Leman AD2

Second wellhead support jacket in the Leman Alpha block cluster. Functions as part of the bridge-linked Alpha infrastructure feeding bulk separation and export.

Operator: Shell

Status: Operational

Leman AD2 platform photo

Image Source: Shell. (All rights belong to the original owner.)

Production: Gas

Operations start: 1968

Water depth: 37 m

Country: UK

Block: 49/26

Type: Fixed steel jacket

Field

Contributes gas from Rotliegendes reservoir into the processed stream at Alpha, supporting integrated flow handling.

Facilities

Works alongside AD1 to gather fluids; routes into shared separation, gas compression and export headers. Utilities and controls are part of a common Leman Alpha management system.

Leman AD2 layout
Image Source: Shell. (All rights belong to the original owner.)

Similar Assets

News

bottom of page