top of page

Leman AD1

A legacy fixed wellhead jacket in the Leman Alpha area serving as a well gathering point feeding the main Leman A processing complex. Typically grouped with AD-level infrastructure.

Operator: Shell

Status: Operational

Leman AD1 platform photo

Image Source: Shell. (All rights belong to the original owner.)

Production: Gas

Operations start: 1968

Water depth: 37 m

Country: UK

Block: 49/26

Type: Fixed steel jacket

Field

Supports Rotliegendes Sandstone gas production in Leman Block 49/26, routed to central facilities for export.

Facilities

AD1 collects gas from production wells and routes it into the central Leman A processing system. This involves flowlines tied into bridge-linked separation and compression trains at the Alpha complex. Utilities (power distribution, controls, chemical injection) are integrated with the neighbor jackets rather than redundantly duplicated.

Leman AD1 layout
Image Source: Shell. (All rights belong to the original owner.)

Similar Assets

News

bottom of page