top of page

Inde [west] CP

CP is a steel jacket production platform on the West Inde area of the Indefatigable gas field (Block 49/23), installed in 1976. It produces natural gas and condensate from CD wells and exports toward AT and onward to shore.

Operator: Perenco

Status: Operational

Inde [west] CP platform photo

Image Source: Perenco. (All rights belong to the original owner.)

Production: Gas

Operations start: 1971

Water depth: 29 m

Country: UK

Block: 49/23

Type: Fixed steel jacket

Field

In the Indefatigable field's West compartment, CP accesses Rotliegend gas reservoirs developed into a multi-platform system that feeds export infrastructure.

Facilities

CP accommodates wellheads, manifolds, and primary flow control equipment. Gas from producing wells is conditioned and routed via pipelines to AT or central hubs for compression, dehydration, metering, and export to Bacton. Topside systems include basic utilities for flow control, safety shutdown, and remote communications. Power and control links tie CP into the wider network of Inde West platforms. Structural design ensures resilience against North Sea environmental loads and supports integration with subsea umbilicals and export pipelines.

Inde [west] CP layout
Image Source: Perenco. (All rights belong to the original owner.)

Similar Assets

News

bottom of page