top of page

34/7 HY08

34/7 HY08 is a floating wind turbine installed as part of the Hywind Tampen offshore wind project. Commissioned in the early 2020s, it provides renewable electricity to offshore oil and gas facilities in the Norwegian North Sea.

Operator: Equinor Energy AS

Status: Under Construction

34/7 HY08 platform photo

Image Source: Equinor Energy AS. (All rights belong to the original owner.)

Production: Wind

Operations start: 2020

Water depth: 340 m

Country: Norway

Block: 34/6

Type: Spar

Field

Hywind Tampen supports the energy needs of the Snorre and Gullfaks fields, reducing emissions from offshore production operations by supplementing conventional power generation.

Facilities

HY08 includes a floating spar foundation, turbine generator, and dynamic subsea export cables. The unit is unmanned, remotely operated, and designed for long-term offshore service with minimal maintenance intervention.

34/7 HY08 layout
Image Source: Equinor Energy AS. (All rights belong to the original owner.)

Similar Assets

News

bottom of page