top of page

34/7 HY06

34/7 HY06 is a floating wind turbine within the Hywind Tampen offshore wind farm. Commissioned during the 2022-2023 installation phase, it supplies renewable energy to offshore oil and gas platforms in the Norwegian North Sea.

Operator: Equinor Energy AS

Status: Under Construction

34/7 HY06 platform photo

Image Source: Equinor Energy AS. (All rights belong to the original owner.)

Production: Wind

Operations start: 2020

Water depth: 340 m

Country: Norway

Block: 34/7

Type: Spar

Field

Hywind Tampen is an offshore wind development serving the Snorre and Gullfaks fields. It is not a hydrocarbon field but an energy supply project integrated with existing offshore production infrastructure.

Facilities

HY06 uses a floating spar foundation anchored by multiple mooring lines. The turbine includes standard offshore wind components and exports power through subsea cables. The installation is unmanned, remotely monitored, and designed for minimal offshore intervention.

34/7 HY06 layout
Image Source: Equinor Energy AS. (All rights belong to the original owner.)