
Type:
Gas
Facility:
Production
Water Depth:
38
Installed:
1968
meters
Block:
53/2
Design:
Fixed steel
Sub Structure:
1110
Topsides Wgt:
2207
tonnes
tonnes
Intro
Perenco fixed platform installed 1984–85 with well slots tied to cluster export infrastructure; recent decommissioning paperwork submitted.
Field
Part of the Rotliegendes reservoir cluster in Block 49/27; gas exported via pipelines toward Bacton after cluster consolidation.
Facilities
H gathers well fluids and routes to the 49/27A/BT export headers. Utilities include control integration, safety systems, and export metering ties.







SUBMIT YOUR STORIES AND PHOTOS
RigOil is built on the stories of the people who lived and worked offshore. If you have photos or memories from life on a North Sea platform, we’d love to include them in the archive.
Upload your photos and help preserve this shared history.*
*By submitting content, you confirm you have the right to share it and grant RigOil a non-exclusive, royalty-free licence to use the material for editorial, promotional, and commercial purposes. Copyright remains with the contributor.


