
Type:
Gas
Facility:
Production
Water Depth:
42
Installed:
1968
meters
Block:
49/28
Design:
Fixed steel
Sub Structure:
896
Topsides Wgt:
2207
tonnes
tonnes
Intro
Perenco fixed jacket installation installed 1984–85; wells tie into Perenco export infrastructure and into the 49/27 hub. Decommissioning activity has commenced.
Field
Rotliegendes reservoir gas from Block 49/27 flows through shared export infrastructure after processing hubs.
Facilities
J collects and feeds gas into cluster export pipelines. Utilities include control and monitoring systems integrated within the Perenco Southern Hub network.







SUBMIT YOUR STORIES AND PHOTOS
RigOil is built on the stories of the people who lived and worked offshore. If you have photos or memories from life on a North Sea platform, we’d love to include them in the archive.
Upload your photos and help preserve this shared history.*
*By submitting content, you confirm you have the right to share it and grant RigOil a non-exclusive, royalty-free licence to use the material for editorial, promotional, and commercial purposes. Copyright remains with the contributor.


