
Type:
Gas
Facility:
Production
Water Depth:
38
Installed:
1968
meters
Block:
49/27
Design:
Fixed steel
Sub Structure:
1143
Topsides Wgt:
857
tonnes
tonnes
Intro
Perenco installation in 49/27E cluster feeding gas into export infrastructure.
Field
Produces Rotliegendes reservoir gas and routes to pipelines via cluster connections; part of Perenco’s field network.
Facilities
ED connects to EP and cluster headers; gas is piped toward BT export infrastructure. Utilities include field controls interfacing with cluster.







SUBMIT YOUR STORIES AND PHOTOS
RigOil is built on the stories of the people who lived and worked offshore. If you have photos or memories from life on a North Sea platform, we’d love to include them in the archive.
Upload your photos and help preserve this shared history.*
*By submitting content, you confirm you have the right to share it and grant RigOil a non-exclusive, royalty-free licence to use the material for editorial, promotional, and commercial purposes. Copyright remains with the contributor.



