top of page
Oil wells2.png

Leman CP

Operational

Operator:

Perenco

Country:

UK

Block:

49/27

49/27
Tree5.png
turbine2.png

Type:

Gas

Facility:

Production

Water Depth:

39

Installed:

1968

meters

Block:

49/27

Design:

Fixed steel

Sub Structure:

729

Topsides Wgt:

1970

tonnes

tonnes

Intro

Partner to CD in the Perenco 49/27C grouping handling production tie-ins.

Field

Part of the Rotliegendes gas producing cluster in 49/27; sends gas to export systems.

Facilities

CP routes production into central lines feeding BT pipeline headers; control and safety systems are aligned across the cluster.

drill2.jpg
Drilltower.jpg
49/27
Heat Exchanger2.png
marineengine.png
Galley Filler.png
valve2.png

SUBMIT YOUR STORIES AND PHOTOS

RigOil is built on the stories of the people who lived and worked offshore. If you have photos or memories from life on a North Sea platform, we’d love to include them in the archive.
 

Upload your photos and help preserve this shared history.*

Image Upload

*By submitting content, you confirm you have the right to share it and grant RigOil a non-exclusive, royalty-free licence to use the material for editorial, promotional, and commercial purposes. Copyright remains with the contributor.

bottom of page