top of page
Oil wells2.png

Leman AD

Operational

Operator:

Perenco

Country:

UK

Block:

49/27

49/27
Tree5.png
turbine2.png

Type:

Gas

Facility:

Production

Water Depth:

36

Installed:

1968

meters

Block:

49/27

Design:

Fixed steel

Sub Structure:

721

Topsides Wgt:

959

tonnes

tonnes

Intro

A fixed wellhead platform in the Leman Alpha area (Block 49/26), providing well slots and flowline interfaces feeding the Leman A processing hub. Bridge-linked within the cluster of Alpha jackets enabling centralized processing and export.

Field

AD serves the Leman gas field’s Rotliegendes reservoir, routing production gas through the Alpha hub. High reservoir continuity in Rotliegendes sands ensures integration across multiple AD subsections.

Facilities

AD collects well fluids and delivers them to the larger Alpha separation and compression network. Its role includes wellhead control and routing of fluids into the main processing headers. Because AD platforms are bridge-linked, utilities and control systems are shared with companion jackets (AC, AP, AK, etc.) to enable integrated dehydration, compression, export metering and pipeline interfacing. Importantly, gas from AD ties into the complex’s pipeline that leads directly to Bacton Gas Terminal.

drill2.jpg
Drilltower.jpg
49/27
Heat Exchanger2.png
marineengine.png
Galley Filler.png
valve2.png

SUBMIT YOUR STORIES AND PHOTOS

RigOil is built on the stories of the people who lived and worked offshore. If you have photos or memories from life on a North Sea platform, we’d love to include them in the archive.
 

Upload your photos and help preserve this shared history.*

Image Upload

*By submitting content, you confirm you have the right to share it and grant RigOil a non-exclusive, royalty-free licence to use the material for editorial, promotional, and commercial purposes. Copyright remains with the contributor.

bottom of page