Type:
Gas
Facility:
Production
Water Depth:
24.4
Installed:
1996
meters
Block:
L-Block
Design:
Fixed steel
Sub Structure:
22209
Topsides Wgt:
106800
tonnes
tonnes
Intro
L9-FF-1 is a fixed gas production platform in block L9 of the Dutch North Sea, commissioned in 1997. It processes natural gas and is one of the principal installations in the L9 area, tied via pipeline to Nogat/NGT export infrastructure.
Field
The L9 field produces conventional gas from Rotliegendes reservoirs. As one of the larger installations in the sector, L9-FF-1 serves as a central production and partial processing hub linking satellite flowlines to export networks.
Facilities
L9-FF-1’s infrastructure comprises production well slots and integrated processing equipment, including separation and gas conditioning in a single central train. Electrical generation supports control, safety, and utility systems. Topside modules include accommodation and control equipment, with subsea pipelines connecting to the Nogat trunkline for export. Design supports long-term offshore operation, with periodic maintenance and inspection performed by support vessels.







SUBMIT YOUR STORIES AND PHOTOS
RigOil is built on the stories of the people who lived and worked offshore. If you have photos or memories from life on a North Sea platform, we’d love to include them in the archive.
Upload your photos and help preserve this shared history.*
*By submitting content, you confirm you have the right to share it and grant RigOil a non-exclusive, royalty-free licence to use the material for editorial, promotional, and commercial purposes. Copyright remains with the contributor.