L9-FF-1

Operational

Operator:

Nederlandse Aardolie Maatschappij BV

Country:

Netherlands

Block:

L-Block

L-Block
Tree5.png
turbine2.png

Type:

Gas

Facility:

Production

Water Depth:

24.4

Installed:

1996

meters

Block:

L-Block

Design:

Fixed steel

Sub Structure:

22209

Topsides Wgt:

106800

tonnes

tonnes

Intro

L9-FF-1 is a fixed gas production platform in block L9 of the Dutch North Sea, commissioned in 1997. It processes natural gas and is one of the principal installations in the L9 area, tied via pipeline to Nogat/NGT export infrastructure.

Field

The L9 field produces conventional gas from Rotliegendes reservoirs. As one of the larger installations in the sector, L9-FF-1 serves as a central production and partial processing hub linking satellite flowlines to export networks.

Facilities

L9-FF-1’s infrastructure comprises production well slots and integrated processing equipment, including separation and gas conditioning in a single central train. Electrical generation supports control, safety, and utility systems. Topside modules include accommodation and control equipment, with subsea pipelines connecting to the Nogat trunkline for export. Design supports long-term offshore operation, with periodic maintenance and inspection performed by support vessels.

Similar Platforms

drill2.jpg
Drilltower.jpg
L-Block
Heat Exchanger2.png
marineengine.png
Galley Filler.png
valve2.png

SUBMIT YOUR STORIES AND PHOTOS

RigOil is built on the stories of the people who lived and worked offshore. If you have photos or memories from life on a North Sea platform, we’d love to include them in the archive.
 

Upload your photos and help preserve this shared history.*

Image Upload

*By submitting content, you confirm you have the right to share it and grant RigOil a non-exclusive, royalty-free licence to use the material for editorial, promotional, and commercial purposes. Copyright remains with the contributor.

bottom of page