
Type:
Gas
Facility:
Production
Water Depth:
26.5
Installed:
2009
meters
Block:
L-Block
Design:
Fixed steel
Sub Structure:
900
Topsides Wgt:
2500
tonnes
tonnes
Intro
L15-FA-1 is a fixed offshore gas production platform in the Dutch North Sea, historically producing gas from the L15 field since the early 1990s. It is integrated into regional processing and export infrastructure feeding the NOGAT pipeline system.
Field
The L15 gas field produces conventional natural gas from reservoirs northwest of Den Helder. It was developed in the late 20th century alongside nearby small field infrastructure tying into national export pipelines.
Facilities
L15-FA-1 is equipped with production wells, gas separation, and initial conditioning facilities, enabling export of treated gas via subsea pipelines. The platform’s topsides historically handled separation and dehydration ahead of export to onshore facilities via the NOGAT system, which connects multiple Dutch offshore gas developments to the gas treatment plant at Den Helder. Utilities include platform power generation, water and fire systems, safety shutdowns, and integrated controls for sustained operations. As part of a mature field, it interfaces with adjacent satellite wells and subsea completions, receiving and delivering production flows into the export network.






SUBMIT YOUR STORIES AND PHOTOS
RigOil is built on the stories of the people who lived and worked offshore. If you have photos or memories from life on a North Sea platform, we’d love to include them in the archive.
Upload your photos and help preserve this shared history.*
*By submitting content, you confirm you have the right to share it and grant RigOil a non-exclusive, royalty-free licence to use the material for editorial, promotional, and commercial purposes. Copyright remains with the contributor.


