
Type:
Gas
Facility:
Production
Water Depth:
26.5
Installed:
1988
meters
Block:
L-Block
Design:
Fixed steel
Sub Structure:
620
Topsides Wgt:
550
tonnes
tonnes
Intro
L10-L is a fixed natural gas production platform in the Dutch L10 block, commissioned in 1988 to support gas recovery and feed the L10 central processing complex. It serves as a satellite wellhead installation integrated into the L10 network.
Field
The installation produces gas from the L10 field’s Rotliegendes sandstone reservoirs. This field is a major Dutch offshore gas producer with long-term development via multiple platforms and subsea wells.
Facilities
L10-L’s facilities consist of multiple wells tied into manifolds and pipelines feeding into the main L10 hub infrastructure. The platform itself provides well access, flow control and basic metering; conditioning (separation, dehydration) and export compression are carried out at central processing installations such as L10-A. On-platform utilities support instrumentation, emergency shutdown systems, and periodic service access; there are no large on-platform processing trains. Gas exported from the L10 area enters the Noordgastransport pipeline system to onshore treatment facilities.







SUBMIT YOUR STORIES AND PHOTOS
RigOil is built on the stories of the people who lived and worked offshore. If you have photos or memories from life on a North Sea platform, we’d love to include them in the archive.
Upload your photos and help preserve this shared history.*
*By submitting content, you confirm you have the right to share it and grant RigOil a non-exclusive, royalty-free licence to use the material for editorial, promotional, and commercial purposes. Copyright remains with the contributor.


