Type:
Gas
Facility:
Production
Water Depth:
26
Installed:
2000
meters
Block:
L-Block
Design:
Fixed steel
Sub Structure:
565
Topsides Wgt:
600
tonnes
tonnes
Intro
L10-M is a fixed platform in the Dutch L10 gas field, installed in 2000 as part of the mature L10 development. It functions as a satellite gas production installation feeding the central L10 process hub and export infrastructure.
Field
The L10-M field sits within the broader L10 gas accumulation, producing conventional gas from Rotliegendes reservoirs in shallow Southern North Sea waters. The L10 gas field is a long-lived, multi-platform development.
Facilities
L10-M hosts a set of gas wells with associated flowlines and manifolds. Produced gas is sent via subsea/pipeline tie-ins to a central processing installation (L10-A) for separation, dehydration, and compression prior to export. On-platform systems include wellhead and flow control, metering, and safety shutdown. Limited utilities support instrumentation and remote operation; no significant gas treatment or compression modules are present locally. Gas is routed into the Noordgastransport pipeline for onshore delivery after conditioning at the hub.







SUBMIT YOUR STORIES AND PHOTOS
RigOil is built on the stories of the people who lived and worked offshore. If you have photos or memories from life on a North Sea platform, we’d love to include them in the archive.
Upload your photos and help preserve this shared history.*
*By submitting content, you confirm you have the right to share it and grant RigOil a non-exclusive, royalty-free licence to use the material for editorial, promotional, and commercial purposes. Copyright remains with the contributor.