
Type:
Gas
Facility:
Production
Water Depth:
37
Installed:
1968
meters
Block:
49/26
Design:
Fixed steel
Sub Structure:
1140
Topsides Wgt:
2490
tonnes
tonnes
Intro
A normally unattended installation (NUI) tied back to Leman Alpha via subsea pipeline PL363, with production exported to Alpha then to Bacton. Scheduled for decommissioning.
Field
Rotliegendes reservoir gas from Block 49/26 sent subsea to Alpha.
Facilities
F has flowlines and subsea tie-backs into AC/AK hubs; control is from Alpha or onshore, with utilities limited to nominal topside systems. It has exported gas via pipelines before planned removal.







SUBMIT YOUR STORIES AND PHOTOS
RigOil is built on the stories of the people who lived and worked offshore. If you have photos or memories from life on a North Sea platform, we’d love to include them in the archive.
Upload your photos and help preserve this shared history.*
*By submitting content, you confirm you have the right to share it and grant RigOil a non-exclusive, royalty-free licence to use the material for editorial, promotional, and commercial purposes. Copyright remains with the contributor.



