
Type:
Gas
Facility:
Production
Water Depth:
37
Installed:
1968
meters
Block:
49/26
Design:
Fixed steel
Sub Structure:
1220
Topsides Wgt:
1693
tonnes
tonnes
Intro
Shell fixed platform (Block 49/26E) historically gathering gas for the central export hub.
Field
Part of Rotliegendes gas field that connects into the main Leman export systems via Leman A.
Facilities
E’s wells were routed into shared flowlines which fed capture and processing at the Alpha complex for pipeline export. Facilities included standard utility support for monitoring, control and safety.







SUBMIT YOUR STORIES AND PHOTOS
RigOil is built on the stories of the people who lived and worked offshore. If you have photos or memories from life on a North Sea platform, we’d love to include them in the archive.
Upload your photos and help preserve this shared history.*
*By submitting content, you confirm you have the right to share it and grant RigOil a non-exclusive, royalty-free licence to use the material for editorial, promotional, and commercial purposes. Copyright remains with the contributor.


