
Type:
Gas
Facility:
Production
Water Depth:
39
Installed:
1968
meters
Block:
49/27
Design:
Fixed steel
Sub Structure:
729
Topsides Wgt:
1970
tonnes
tonnes
Intro
Partner to CD in the Perenco 49/27C grouping handling production tie-ins.
Field
Part of the Rotliegendes gas producing cluster in 49/27; sends gas to export systems.
Facilities
CP routes production into central lines feeding BT pipeline headers; control and safety systems are aligned across the cluster.







SUBMIT YOUR STORIES AND PHOTOS
RigOil is built on the stories of the people who lived and worked offshore. If you have photos or memories from life on a North Sea platform, we’d love to include them in the archive.
Upload your photos and help preserve this shared history.*
*By submitting content, you confirm you have the right to share it and grant RigOil a non-exclusive, royalty-free licence to use the material for editorial, promotional, and commercial purposes. Copyright remains with the contributor.


