top of page
Oil wells2.png

34/7 HY06

Under Construction

Operator:

Equinor Energy AS

Country:

Norway

Block:

34/7

34/7
Tree5.png
turbine2.png

Type:

Gas

Facility:

Production

Water Depth:

340

Installed:

2020

meters

Block:

34/7

Design:

Floating steel

Sub Structure:

0

Topsides Wgt:

0

tonnes

tonnes

Intro

34/7 HY06 is a floating wind turbine within the Hywind Tampen offshore wind farm. Commissioned during the 2022–2023 installation phase, it supplies renewable energy to offshore oil and gas platforms in the Norwegian North Sea.

Field

Hywind Tampen is an offshore wind development serving the Snorre and Gullfaks fields. It is not a hydrocarbon field but an energy supply project integrated with existing offshore production infrastructure.

Facilities

HY06 uses a floating spar foundation anchored by multiple mooring lines. The turbine includes standard offshore wind components and exports power through subsea cables. The installation is unmanned, remotely monitored, and designed for minimal offshore intervention.

drill2.jpg
Drilltower.jpg
34/7
Heat Exchanger2.png
marineengine.png
Galley Filler.png
valve2.png

SUBMIT YOUR STORIES AND PHOTOS

RigOil is built on the stories of the people who lived and worked offshore. If you have photos or memories from life on a North Sea platform, we’d love to include them in the archive.
 

Upload your photos and help preserve this shared history.*

Image Upload

*By submitting content, you confirm you have the right to share it and grant RigOil a non-exclusive, royalty-free licence to use the material for editorial, promotional, and commercial purposes. Copyright remains with the contributor.

bottom of page