
Type:
Gas
Facility:
Production
Water Depth:
27
Installed:
1980
meters
Block:
L-block
Design:
Fixed steel
Sub Structure:
341
Topsides Wgt:
187
tonnes
tonnes
Intro
L10-BB is a fixed wellhead satellite platform in the L10 gas field, installed in 1980. It supports additional well slots tied into the L10-B satellite gathering system, feeding into the L10-A hub.
Field
As part of the L10 field, BB accesses Rotliegendes sandstone reservoirs; its development augments production capacity by feeding wells into the satellite-to-hub network centered on L10-A.
Facilities
L10-BB has production wellheads and manifold infrastructure linked to L10-B and onward pipelines into the L10-A complex. It provides flow control, basic metering and emergency shutdown capability. There is no major processing on the platform; it functions as a gathering node dispatching gas to central dehydration and compression facilities at AP and AC. Utilities include local instrumentation power and safety systems. The export path remains through the L10 hub into the North Sea trunk pipeline network to Uithuizen.







SUBMIT YOUR STORIES AND PHOTOS
RigOil is built on the stories of the people who lived and worked offshore. If you have photos or memories from life on a North Sea platform, we’d love to include them in the archive.
Upload your photos and help preserve this shared history.*
*By submitting content, you confirm you have the right to share it and grant RigOil a non-exclusive, royalty-free licence to use the material for editorial, promotional, and commercial purposes. Copyright remains with the contributor.


