
Type:
Gas
Facility:
Production
Water Depth:
39
Installed:
1968
meters
Block:
49/27
Design:
Fixed steel
Sub Structure:
902
Topsides Wgt:
845
tonnes
tonnes
Intro
Fixed production platform in the Perenco 49/27C cluster supplying gas to cluster export headers.
Field
Produces gas from Rotliegendes reservoir in Block 49/27 feeding the regional pipeline network to Bacton.
Facilities
CD collects well fluids and pipelines them to the CP and BT networks for compression and export. Its utilities are tied into cluster control systems.







SUBMIT YOUR STORIES AND PHOTOS
RigOil is built on the stories of the people who lived and worked offshore. If you have photos or memories from life on a North Sea platform, we’d love to include them in the archive.
Upload your photos and help preserve this shared history.*
*By submitting content, you confirm you have the right to share it and grant RigOil a non-exclusive, royalty-free licence to use the material for editorial, promotional, and commercial purposes. Copyright remains with the contributor.


