top of page
Oil wells2.png

Leman BP

Operational

Operator:

Shell

Country:

UK

Block:

49/26

49/26
Tree5.png
turbine2.png

Type:

Gas

Facility:

Production

Water Depth:

37

Installed:

1968

meters

Block:

49/26

Design:

Fixed steel

Sub Structure:

516

Topsides Wgt:

1526

tonnes

tonnes

Intro

Fixed production/tie-in jacket within the Perenco 49/27B cluster feeding gas to export headers.

Field

A component in the Rotliegendes gas network whose fluids go to Bacton via two 30- pipelines.

Facilities

BP collects and routes gas into the Perenco 49/27B export network, typically sending to BT pressure control before shore export. Utilities like platform controls and safety interface with the cluster.

Similar Platforms

Leman BP, Leman BC and BD, Leman CD, Leman CP, Leman DD

drill2.jpg
Drilltower.jpg
49/26
Heat Exchanger2.png
marineengine.png
Galley Filler.png
valve2.png

SUBMIT YOUR STORIES AND PHOTOS

RigOil is built on the stories of the people who lived and worked offshore. If you have photos or memories from life on a North Sea platform, we’d love to include them in the archive.
 

Upload your photos and help preserve this shared history.*

Image Upload

*By submitting content, you confirm you have the right to share it and grant RigOil a non-exclusive, royalty-free licence to use the material for editorial, promotional, and commercial purposes. Copyright remains with the contributor.

bottom of page