top of page
Oil wells2.png

Inde [west] CP

Operational

Operator:

Perenco

Country:

UK

Block:

49/23

49/23
Tree5.png
turbine2.png

Type:

Gas

Facility:

Production

Water Depth:

29

Installed:

1971

meters

Block:

49/23

Design:

Fixed steel

Sub Structure:

950

Topsides Wgt:

1847

tonnes

tonnes

Intro

CP is a steel jacket production platform on the West Inde area of the Indefatigable gas field (Block 49/23), installed in 1976. It produces natural gas and condensate from CD wells and exports toward AT and onward to shore.

Field

In the Indefatigable field’s West compartment, CP accesses Rotliegend gas reservoirs developed into a multi-platform system that feeds export infrastructure.

Facilities

CP accommodates wellheads, manifolds, and primary flow control equipment. Gas from producing wells is conditioned and routed via pipelines to AT or central hubs for compression, dehydration, metering, and export to Bacton. Topside systems include basic utilities for flow control, safety shutdown, and remote communications. Power and control links tie CP into the wider network of Inde West platforms. Structural design ensures resilience against North Sea environmental loads and supports integration with subsea umbilicals and export pipelines.

drill2.jpg
Drilltower.jpg
49/23
Heat Exchanger2.png
marineengine.png
Galley Filler.png
valve2.png

SUBMIT YOUR STORIES AND PHOTOS

RigOil is built on the stories of the people who lived and worked offshore. If you have photos or memories from life on a North Sea platform, we’d love to include them in the archive.
 

Upload your photos and help preserve this shared history.*

Image Upload

*By submitting content, you confirm you have the right to share it and grant RigOil a non-exclusive, royalty-free licence to use the material for editorial, promotional, and commercial purposes. Copyright remains with the contributor.

bottom of page