
Type:
Gas
Facility:
Others
Water Depth:
0
Installed:
2012
meters
Block:
NA
Design:
Others
Sub Structure:
0
Topsides Wgt:
0
tonnes
tonnes
Intro
Cruden Bay refers to the onshore oil pipeline landfall and terminal area at Cruden Bay, Aberdeenshire, Scotland, where the Forties Pipeline System (FPS) from the UK North Sea reaches the coast. It is not an offshore platform itself but a critical onshore reception and transfer node for crude delivered via subsea pipeline.
Field
Cruden Bay connects to the Forties crude oil pipeline that starts at the Forties Charlie platform via the Forties Unity riser platform. Oil from multiple North Sea fields is gathered into this pipeline and brought ashore at Cruden Bay before onward processing and export.
Facilities
Cruden Bay’s infrastructure comprises the marine-to-onshore transition of the Forties Pipeline System, including subsea pipeline reception facilities, pig launchers/receivers, and manifold connections for onward flow to processing terminals. The Forties pipeline is ~169-km, 36-inch diameter carrying crude to shore. After landfall, crude is routed via onshore pipeline to processing at Kinneil Terminal and storage/export at Dalmeny and Hound Point. Cruden Bay does not include separation, metering, or export loading itself but is vital for transferring hydrocarbons from deepwater subsea to onshore infrastructure.
Similar Platforms







SUBMIT YOUR STORIES AND PHOTOS
RigOil is built on the stories of the people who lived and worked offshore. If you have photos or memories from life on a North Sea platform, we’d love to include them in the archive.
Upload your photos and help preserve this shared history.*
*By submitting content, you confirm you have the right to share it and grant RigOil a non-exclusive, royalty-free licence to use the material for editorial, promotional, and commercial purposes. Copyright remains with the contributor.


