Type:
Gas
Facility:
Production
Water Depth:
26.5
Installed:
1974
meters
Block:
L-Block
Design:
Fixed steel
Sub Structure:
494
Topsides Wgt:
550
tonnes
tonnes
Intro
L10-B is a fixed offshore wellhead and production platform in the L10 gas field, installed in 1974. It serves as a satellite to the L10-A complex, delivering gas via pipeline to the core hub.
Field
The L10 field produces conventional Rotliegendes gas. Satellite platforms like L10-B enable wide area production with centralized treatment and export via the L10-A hub.
Facilities
L10-B’s facilities comprise multiple production wells with flowlines and manifold connections. Produced gas is routed via subsea pipelines to the L10-A central processing complex for separation, dehydration, and export. On-platform systems provide well control, basic metering, and emergency shutdown. Minimal processing occurs locally; conditioning and export compression are centralized at AP and AC. Utilities include instrumentation power, control systems, and safety features. Gas from L10-B is integrated into the field network and exported to shore via the Noordgastransport pipeline.







SUBMIT YOUR STORIES AND PHOTOS
RigOil is built on the stories of the people who lived and worked offshore. If you have photos or memories from life on a North Sea platform, we’d love to include them in the archive.
Upload your photos and help preserve this shared history.*
*By submitting content, you confirm you have the right to share it and grant RigOil a non-exclusive, royalty-free licence to use the material for editorial, promotional, and commercial purposes. Copyright remains with the contributor.