
Type:
Gas
Facility:
Production
Water Depth:
37
Installed:
1968
meters
Block:
49/26
Design:
Fixed steel
Sub Structure:
624
Topsides Wgt:
1852
tonnes
tonnes
Intro
A production platform in both Shell (49/26A) and Perenco (49/27A) zones, providing primary production entry and slugcatching feeding the Leman A complex and onward export pipelines to Bacton.
Field
A central contributing installation to the Leman field’s Rotliegendes gas system in both licensed blocks. Gas flows into shared export hubs that tie back to the Bacton Gas Terminal.
Facilities
AP platforms handle primary gathering and slug catch for several well flowlines. They integrate into Leman A central processing for separation, compression and dehydration before main export. Utilities, field controls and safety systems are coordinated across bridge-linked jackets in the Alpha hub or, for 49/27A Perenco installations, tied into a hub approach feeding the export headers to Bacton via two 30-inch pipelines.







SUBMIT YOUR STORIES AND PHOTOS
RigOil is built on the stories of the people who lived and worked offshore. If you have photos or memories from life on a North Sea platform, we’d love to include them in the archive.
Upload your photos and help preserve this shared history.*
*By submitting content, you confirm you have the right to share it and grant RigOil a non-exclusive, royalty-free licence to use the material for editorial, promotional, and commercial purposes. Copyright remains with the contributor.


