Type:
Gas
Facility:
Production
Water Depth:
23
Installed:
1968
meters
Block:
49/27
Design:
Fixed steel
Sub Structure:
723
Topsides Wgt:
950
tonnes
tonnes
Intro
Perenco Block 49/27 fixed platform collecting well gas for cluster export.
Field
Works within the Rotliegendes reservoir selling gas into established export pipelines.
Facilities
DD ties to DP and cluster headers; gas is piped to shore. Utilities consist of standard controls tied into Perenco networks.